Project Description
Removal of 12 Tonne Toilet Unit, For Bowmer and Kirkland / CCUK Ltd
June 2016
As part of the Network Rail redevelopment of the approach to Slough Station, Twenty Twelve Civils were asked to remove this mobile toilet unit from a site designated for new office accommodation.
Much of the basement for the new office block had already been constructed, leaving restricted access to remove the ‘stranded’ 12-tonne unit.
Twenty Twelve Civils were tasked with the disconnection and capping of all mains services, prior to removing the toilet and with the aid of a 120-tonne mobile crane, transferring the toilet unit onto a waiting low loader, taking the unit for refurbishment prior to re-siting.
This is typical of the many smaller projects undertaken by Twenty Twelve Civils requiring detailed planning and co-ordination to cause minimum disruption to the activities of others.